Dynamic assurance with ReSonAte
Videos
10/08/2021
This video presents a real-time hazard rate calculation with ReSonAte framework based on a CP2 thruster degradation scenario.
ReSonAte is using onboard LEC and AM data only as input - no ground truth data was used.
- Degradation starts at t=50s
(thruster #0 efficiency drops to 79%) - In nominal state, hazard rate is low
- After degradation starts:
- Without control reallocation, hazard rate is high
- With control reallocation, hazard rate is moderate
- Input to ReSonAte:
- FDIR LEC AM assured output (degraded thruster efficiency)
- FDIR control reallocation output (reallocated thruster efficiency)